Elmo BoM can not only boast the most valuable benefits and features, but also very enviable success stories. Here are summaries of the most recent.
Enterprise: | Plastique Micron Inc. |
Issue: | Eliminating redundant data entry and data desynchronization |
|
|
| The challenge At the time, their system was only capable of transferring production data to the ERP. If they wanted to transfer design data to the ERP with their current system, it had to be transferred the old-fashioned way: by manually re-typing the information. This limitation would result in hours of time spent re-keying data, increasing the risk of manufacturing errors.There had to be a better way. The solution Equally important, the batch approach allowed Plastique Micron to publish design data and metadata to their intranet – something that they had never been able to do before. “It’s been great for us,” says David Pouliot of Plastique Micron. “Now, our sales representatives can go on our intranet from wherever they are and see design data and drawings. It makes life much easier.” |
